advanced·20 min·De pago
STP Root Bridge Elected Wrong
The network is reachable, but spanning tree chose the wrong root and a longer forwarding path.
Escenario
Meadowbrook Harvesters added a redundant switch path to keep the packing floor online during maintenance. The network is still reachable, but monitoring shows traffic taking the longer path and the wrong switch acting as the spanning-tree root. Correct the election so forwarding uses the intended topology without removing redundancy.
Objetivos de aprendizaje
- spanning tree
- root bridge election
- working but suboptimal path
Topología y configuración
Este entorno contiene 5 dispositivos (2 Hosts, 3 Switchs). Configuras y solucionas problemas de las habilidades de redes listadas arriba.
Temas del plan de estudios
Objetivos de certificación
- ccna-200-301 · Objetivo 2.5: Interpret basic operations of Rapid PVST+ Spanning Tree Protocol